The most challenging thing with this type of work is the size of some of the components and the requests sometimes require you to think out of the box to achieve the results they require, but we have had to cope with parts over 7 meters in length and spark erode key ways inside the ends 50 to 100 cm down.
Removing broken taps or finish small deep holes where conventional methods failed are a common request.